Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

SKU: AR-002406
Product Type: ATS switch
Rs.19,999.00
Rs.19,999.00
Rs.19,999.00
Save Rs.0.00
Subtotal: Rs.19,999.00
  • Alladin Store

7 Days Check Warranty

Estimated Shipping Time: 48 to 72 Hours

You Have to Pay Partial Payment in Advance for Order Confirmation

Full Advance Payment Required for Order Processing of Batteries, Inverters, And Structures.

Heavy weight parcels will be dispatch through Cargo Service

Customer will pay Cargo charges on delivery.

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Rs.19,999.00

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Rs.19,999.00

MORA AES-988-100/4P | 100A 3-Phase Dual Power Automatic Transfer Switch (ATS)

Fast, Reliable Power Switching for Backup Systems

The MORA AES-988-100/4P Automatic Transfer Switch (ATS) is a high-performance, 3-phase 4-pole dual power switch designed to ensure uninterrupted power supply for homes, businesses, and industrial equipment. With a rated current of 100A and voltage of 400V AC, it offers seamless switching between normal and reserve power sources — all within 2.5 seconds.

 Key Features & Specifications:

  • Brand: MORA
  • Model: AES-988-100/4P
  • Rated Current: 100A
  • Rated Voltage: 400V AC (50/60Hz)
  • Control Voltage: 220V AC
  • Insulation Voltage: 800V AC
  • Impulse Voltage Withstand: 6kV
  • Switching Time: Less than 2.5 seconds
  • Contact Load: High power
  • Operation Modes:
    • Automatic Mode: Switches between main and backup automatically
    • Manual Mode: Manual switch operation with front control knob

How It Works:

  • Prioritizes Normal Power when available
  • If Normal Power fails, automatically switches to Reserve Power
  • Does not control generator start/stop – only handles power switching
  • Temporary power interruption occurs during switching (<2.5s)

⚠️Note: Ensure critical loads are backed by a UPS if uninterrupted power is required during the 2.5-second switching delay.

Related Products

Recently Viewed Products