Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

SKU: AR-002406
Product Type: ATS switch
Rs.19,999.00
Rs.21,999.00
Rs.19,999.00
Save Rs.2,000.00
Subtotal: Rs.19,999.00
  • Alladin Store

7 Days Check Warranty

Estimated Shipping Time: 48 to 72 Hours

You Have to Pay Partial Payment in Advance for Order Confirmation

Heavy weight parcels will be dispatch through Cargo Service

Customer will pay Cargo charges on delivery.

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Rs.21,999.00 Rs.19,999.00

Mora AES-988-100/4P Handle Type 100A 4P AC Three Phase Dual Power Automatic Transfer Switch ATS

Rs.21,999.00 Rs.19,999.00

MORA AES-988-100/4P | 100A 3-Phase Dual Power Automatic Transfer Switch (ATS)

Fast, Reliable Power Switching for Backup Systems

The MORA AES-988-100/4P Automatic Transfer Switch (ATS) is a high-performance, 3-phase 4-pole dual power switch designed to ensure uninterrupted power supply for homes, businesses, and industrial equipment. With a rated current of 100A and voltage of 400V AC, it offers seamless switching between normal and reserve power sources — all within 2.5 seconds.

 Key Features & Specifications:

  • Brand: MORA
  • Model: AES-988-100/4P
  • Rated Current: 100A
  • Rated Voltage: 400V AC (50/60Hz)
  • Control Voltage: 220V AC
  • Insulation Voltage: 800V AC
  • Impulse Voltage Withstand: 6kV
  • Switching Time: Less than 2.5 seconds
  • Contact Load: High power
  • Operation Modes:
    • Automatic Mode: Switches between main and backup automatically
    • Manual Mode: Manual switch operation with front control knob

How It Works:

  • Prioritizes Normal Power when available
  • If Normal Power fails, automatically switches to Reserve Power
  • Does not control generator start/stop – only handles power switching
  • Temporary power interruption occurs during switching (<2.5s)

⚠️Note: Ensure critical loads are backed by a UPS if uninterrupted power is required during the 2.5-second switching delay.

Related Products

Recently Viewed Products